Gateway Distriparks LimitedQ1 FY27 Results & Financial Update

Gateway Distriparks Limited: Q1 FY27 consolidated results and company financials – revenue ₹549.30 Cr, PAT ₹51.27 Cr. Explore reported YoY/QoQ movements, margins, business drivers and management commentary. This page does not provide a rating, target price or investment recommendation.

NSE: GATEWAYPublished 19 Oct 2026Updated 19 Oct 2026~6 min read
Quarter at a glanceCurrent reported figures.Change figures appear when a comparable reported period is available.
Revenue from operations₹549.30 CrReported Q1 FY27
Profit after tax₹51.27 CrReported Q1 FY27
EPS₹0.98Reported Q1 FY27

Find an answer

Ask this result

Chart · Market context

Gateway Distriparks price & chart

Market price₹45.98
1Y return—Price return
Loading market chart…
Spotted a factual error?Tell us the number, date or statement and we will re-check the underlying records and calculations.Report an error
Quarterly Results AnalysisExplore Gateway Distriparks Q1 FY27 quarterly results and earnings: revenue, profit (PAT), EBITDA, margins, YoY and QoQ growth, order book or business updates where reported, financial performance and management commentary. Reported figures and Nivata calculations are shown separately; no buy, sell or hold recommendation is provided.

Quarter overview

Quarterly earnings analysis

01

Gateway Distriparks reported consolidated total income of INR 553.70 crore for the quarter ended June 30, 2026, remaining flat compared to INR 554.10 crore in the corresponding period of the previous fiscal year.

02

Total container throughput across the core business contracted slightly by 1.96% year-on-year to 1,83,867 TEUs, driven by a 0.69% decline in the rail vertical to 92,634 TEUs and a 3.22% decline in the CFS vertical to 91,233 TEUs.

03

Consolidated Profit After Tax (PAT) stood at INR 51.27 crore, reflecting an 18% decline from INR 62.20 crore in Q1 FY26, influenced by shifts in tax provisioning frameworks and ongoing operational cost adjustments.

04

Management noted that external pressures, including the ongoing West Asia conflict, created cargo imbalances and elevated empty running expenses, while fuel price hikes, minimum wage revisions, and general input cost inflation weighed on margins.

05

The quarter's financial performance includes the consolidation of subsidiary Snowman Logistics, which contributed INR 177.1 crore in revenue, INR 29.3 crore in EBITDA, and INR 4.6 crore in net profit for Q1 FY27.

06

Earnings per share (EPS) for the quarter came in at INR 0.98, compared to INR 1.20 in Q1 FY26, and the company declared a first interim dividend of INR 1.25 per share for FY27.

07

During the quarter, the company adopted the concessional tax regime under Section 115BAA of the Income-tax Act effective April 1, 2026, setting the statutory tax rate to 25.17% without Section 80-IA deductions, though actual cash tax outgo remained stable due to the utilization of accumulated MAT credits.

01 · Business model

What does Gateway Distriparks do?

Gateway Distriparks Limited operates as an integrated inter-modal logistics service provider in India, managing a network of 10 container terminals strategically positioned across key industrial corridors in North, West, and Central India.

The core operational framework combines a fleet of 35 trainsets operating under a pan-India railway license with over 480 tractor-trailers, linking inland container depots (ICDs) and container freight stations (CFS) directly to major western maritime gateways including JNPT, Mundra, Pipavav, and Kandla.

The service suite encompasses rail and road container transportation, general and bonded warehousing spanning 1,72,000 square meters, container handling services, and specialized value-added services such as packaging and palletizing.

Through its listed subsidiary Snowman Logistics Limited, in which it holds a 50.01% stake, the company extends its multimodal network into temperature-controlled cold chain logistics and pan-India distribution for food, pharmaceuticals, and industrial goods.

02 · Historical context

What shaped the business before this quarter

Business evolution

Since its inception, Gateway Distriparks established itself as an early mover, launching India's first private multi-user container freight station and operating as the first private container train operator.

Recent trajectory

The company expanded its cold chain capabilities through the acquisition of a controlling 50.01% stake in Snowman Logistics, consolidating its financial results starting December 24, 2024.

03 · Financial snapshot

Current-quarter financial snapshot

MetricQ1 FY27
Revenue from operations₹549.30 Cr
Total income₹553.70 Cr
Profit before tax₹70.91 Cr
Profit after tax₹51.27 Cr
EPS₹0.98

04 · Why it moved

Why the quarter looked the way it did

What drove revenue

Rail Vertical Throughput

Handled 92,634 TEUs during Q1 FY27, down 0.69% compared to 93,282 TEUs in Q1 FY26, reflecting subdued production and global consumption trends.

CFS Vertical Throughput

Handled 91,233 TEUs in Q1 FY27, declining 3.22% from 94,268 TEUs in the year-ago period due to moderated EXIM cargo flows at port gateways.

Subsidiary Revenue Contribution

Snowman Logistics contributed consolidated revenue of INR 177.1 crore to the group's top-line performance during the quarter.

Core Revenue per TEU

Core ex-Snowman realization stood at INR 20,281 per TEU for Q1 FY27, compared to INR 20,739 per TEU in Q1 FY26.

What drove margins

Operating Cost Pressures

Operating expenses were impacted by freight imbalances caused by the West Asia conflict, rising fuel prices, and mandatory minimum wage revisions.

Core EBITDA Efficiency

Core ex-Snowman EBITDA per TEU moderated to INR 5,012 in Q1 FY27 from INR 5,219 in Q1 FY26, keeping the core EBITDA margin steady at 25%.

Consolidated Margin Profile

Consolidated EBITDA for the quarter reached INR 121.5 crore with an EBITDA margin of 21.9%, while PAT margin stood at 9.3%.

05 · Demand, customers & order book

Where demand is coming from

Total Quarterly Volume

Aggregate consolidated throughput across rail and CFS verticals reached 1,83,867 TEUs for Q1 FY27.

06 · Segments, products & geography

Which parts of the business are doing the work

Segments and products

Multimodal Rail and CFS Network

The core logistics segment operated 35 trainsets and maintained 10 terminals across key industrial corridors, supported by 480+ tractor-trailers.

Cold Chain Segment Operations

Snowman Logistics operated as the group's temperature-controlled warehousing and distribution arm, delivering INR 29 crore in EBITDA on INR 177 crore of revenue.

Geography and market mix

Western Corridor Integration

Operations leveraged the fully completed Western Dedicated Freight Corridor (WDFC), enabling double-stack train runs connecting northern aggregation hubs like Garhi Harsaru and Viramgam to western ports.

07 · Capacity, projects & execution

What is being built, commissioned or delivered

Capacity, production and utilisation

Pan-India Terminal Capacity

Total installed operational capacity across rail-linked ICDs and CFS facilities stood at 14,20,000 TEUs per annum, excluding upcoming projects.

Snowman Pallet Capacity

Snowman Logistics maintained its infrastructure expansion trajectory toward achieving a capacity of 1,70,000 pallets by the middle of next year.

Projects, capex and execution

Indore ICD Development

Construction activity commenced on the 26.4-acre land parcel at Indore for a planned ~1,20,000 TEUs p.a. ICD, with commercial operations scheduled to begin in 2028.

Ankleshwar MMLP Readiness

New Ankleshwar MMLP received customs permission to handle EXIM volumes, with operations slated to commence in September 2026.

Fleet and Warehouse Expansion

The company commissioned a 100,000 sq. ft. warehouse at ICD Piyala for export consolidation cargo, added 100 x 40-foot domestic containers, and scheduled the delivery of two additional high-speed rakes in Q2.

08 · Strategy & new businesses

How the company is trying to change its growth mix

Asset-Light MMLP and Fleet Modernization

Expanding the container fleet to 37 rakes and integrating electric and CNG-powered tractor-trailers into first- and last-mile operations to align with decarbonization goals.

09 · Reported developments

What changed operationally

Customs Clearance at Ankleshwar

Received customs notification for EXIM handling at MMLP Ankleshwar, opening a new operational revenue stream starting September 2026.

Interim Dividend Declaration

Board declared a first interim dividend of INR 1.25 per share for FY27.

10 · Pressure points & risks

What is not going smoothly

Geopolitical and Cost Headwinds

West Asia conflict disruptions caused freight flow imbalances, empty container running, and margin pressure alongside wage and fuel inflation.

11 · Items worth noticing

The line items that can distort a quick read

Labour-Codes Provision Reversal

A non-recurring exceptional gain of INR 1.6 crore was booked following the reassessment of employee compensation rules relative to consolidated labor code provisions.

12 · Cash flow & balance sheet

Profit is one thing. Cash and funding tell another part of the story.

Capital allocation & funding

Credit Rating Affirmation

Maintained an IND AA / Stable rating for long-term facilities and IND A1+ for short-term facilities, reflecting a strong balance sheet structure.

13 · Beyond the numbers

What changed beyond the numbers

Reported update

Exceptional Item Reversal

Recorded an exceptional item credit of INR 1.6 crore, representing the partial reversal of an earlier INR 2.7 crore Labour-Codes provision following reassessment under new employee compensation rules effective April 1, 2026.

14 · Previous-quarter changes

What changed since the previous quarter

Shipping Line Empty Repositioning

Initiated proactive shipping line empty container movement protocols during the preceding quarter to mitigate corridor imbalance pressures.

15 · Key Q&A

The quarter, answered directly

What does Gateway Distriparks do?

Gateway Distriparks Limited operates as an integrated inter-modal logistics service provider in India, managing a network of 10 container terminals strategically positioned across key industrial corridors in North, West, and Central India.

What is the clearest takeaway from Q1 FY27?

Gateway Distriparks reported consolidated total income of INR 553.70 crore for the quarter ended June 30, 2026, remaining flat compared to INR 554.10 crore in the corresponding period of the previous fiscal year.

What drove revenue or demand?

Handled 92,634 TEUs during Q1 FY27, down 0.69% compared to 93,282 TEUs in Q1 FY26, reflecting subdued production and global consumption trends.

What mattered most for margins or profitability?

Operating expenses were impacted by freight imbalances caused by the West Asia conflict, rising fuel prices, and mandatory minimum wage revisions.

What changed operationally beyond the headline numbers?

Total installed operational capacity across rail-linked ICDs and CFS facilities stood at 14,20,000 TEUs per annum, excluding upcoming projects.

What are the main pressure points disclosed for the quarter?

West Asia conflict disruptions caused freight flow imbalances, empty container running, and margin pressure alongside wage and fuel inflation.

16 · Scenario calculator

Earnings sensitivity: what if growth and margins change?

Starting point

Build your own next-quarter scenario

Reported values are prefilled where a comparable basis is available. Otherwise, the field starts at 0. You can overwrite every field.

Example: enter 10 for 10% revenue growth. Enter -100 for a 1 percentage-point margin decline.

Scenario output
Scenario revenue / income₹0 cr
Scenario profit after tax₹0 cr
Profit change vs base₹0 cr (0%)
Scenario margin0%
Growth needed to keep profit flat after this margin move0%

The calculator holds the selected margin basis constant except for the basis-point adjustment you enter. It does not estimate tax, finance cost, dilution, working capital, valuation or share price.

17 · Next filing checkpoints

What the next disclosure can confirm or change

  1. 01

    MMLP Ankleshwar Launch: Track the commencement of EXIM container operations at Ankleshwar MMLP scheduled for September 2026.

  2. 02

    Indore ICD Construction Progress: Monitor civil construction milestones and land development updates on the 26.4-acre Indore terminal project ahead of its 2028 operational target.

  3. 03

    Snowman Capacity Expansion: Observe progress toward Snowman Logistics' target of reaching 1,70,000 pallet capacity by mid-FY28.

Learn the metrics

Need the concepts first?

Use Nivata’s plain-English guides to understand the accounting terms used in this brief before interpreting them.

← Back to Quarterly Results